Project: United States Coast Gaurd New Moorings
Service: Marina Construction
Location: Sturgeon Bay, WI
Date: Fall/Winter 2013
Project Details: Removed and existing timber launchway and expanded the boat mooring bay with a new steel sheet pile dockwall. Dredged the mooring basin and installed a new floating pier. The project had several challenges associated with connecting the new sheet pile walls to the existing 100 year old wakefield wall.