Project: Power Plant Pipe Pile Foundation
Service: Pile Driving
Location: Ashland, WI
Date: Summer 2008
Project Details: 10.75″ Pipe Piles driven 120′ to 150 ton capacities. Used a Manitowoc 2900 WC (70 ton) crane with an I-9 Diesel Hammer.
Project: Power Plant Pipe Pile Foundation
Service: Pile Driving
Location: Ashland, WI
Date: Summer 2008
Project Details: 10.75″ Pipe Piles driven 120′ to 150 ton capacities. Used a Manitowoc 2900 WC (70 ton) crane with an I-9 Diesel Hammer.